Case Study – Chick Constructions Pty Ltd

Project Name: 2016 Melbourne Grand Prix Chick Constructions required access solutions to the Paddock club warming kitchens. Requirements were that the solution be a temporary (movable)  fixture, safe & anti slip and meet the confided space requirements. After a site inspection with the customer & a vigorous meeting with our engineering team it was recommended that […]

read more

Case Study – Calco Trusses and Timber

When the boys at Calco Trusses & Timber came down to see our rep, Ali, to discuss their height requirements they took one look at our work platforms and knew that was their solution. They needed a working height of 2700mm – no problem we thought, we have our standard work platforms in stock & […]

read more

Case Study – Tasmanian Alkaloids Pty Ltd

Project Name: Larox plate filter press When Tasmanian Alkaloids needed a solution to an access predicament for their Larox machine they came to us. Tasmanian Alkaloids are a great customer and they needed a solution that was safe no matter how long the process would take. After numerous site inspections, meetings & drawings a custom […]

read more

Case Study – Dyno Nobel Asia Pacific Pty Ltd

Project Name: Mining platforms Dyno Nobel required an access solution for their mining sites throughout QLD & WA. The customer’s requirements was that the product be a minimum of 2600mm high, instead of walk thru access have a hang over/cantilever of approx 800mm & durable, lockable wheels. We recommended that the platform have a counter […]

read more

Case Study – Pacific National

Project Name: Height Assess PN We love a challenge at STAR. So when Pacific National requested a 13M long custom access platform we were ready. A platform at this excessive length was for loading/unloading 13M tray trucks that they encounter on a weekly base. We are currently in the early stages of designing the platform […]

read more